Meydan Shopping Centre The Hunger Restaurant

Location
Ümraniye, Istanbul
Building Type
Restaurant
Project Photographs
21 Photographs

We completed the mechanical installations for the 700 m² The Hunger restaurant at Meydan Istanbul Shopping Centre.

Installed Systems

  • Water-Source Heat Pump (WSHP)
  • Heat Recovery Ventilation
  • Kitchen Ventilation
  • Electrostatic Kitchen Extract Filtration Unit
  • Fire Protection
  • Natural Gas Installation
  • Plumbing
Project DetailsExplore the installation scope

Project Description

We completed the mechanical installations for the 700 m² The Hunger restaurant at Meydan Istanbul Shopping Centre. Our scope comprised heating, cooling, ventilation, fire protection, natural gas and plumbing.

For heating and cooling, we used seven TCH060 water-source heat pumps (WSHP). A heat recovery system supported the ventilation and air conditioning installation.

We installed 300 m² of air ducting fabricated from 2 mm DKP black steel sheet, with 5 cm foil-faced glass-wool insulation.

Kitchen extract treatment used a 20,000 m³/h electrostatic filtration unit, installed with activated carbon filtration and a grease pre-filter cabinet.

Fire protection comprised 72 pendent sprinklers and two fire hose cabinets, with dry-type protection in the cold rooms. We also completed the natural gas and plumbing works, using cast-iron pipework for wastewater and drainage.