Silivri Mushroom Greenhouse
- Location
- Silivri, Istanbul
- Building Type
- Greenhouse
- Project Photographs
- 04 Photographs
We installed air conditioning and precision ventilation at the mushroom greenhouse in Silivri, Istanbul, with automation for humidity and temperature control.
Installed Systems
Project DetailsExplore the installation scope
Project Description
We installed air conditioning and precision ventilation at the mushroom greenhouse in Silivri, Istanbul, with automation for humidity and temperature control.
We mounted spiral air ducts at ceiling level, completed the bend connections and hangers, and fitted end caps. The work covered preparation of the duct sections and fittings outside the greenhouse through to installation of the internal duct routes. Air conditioning, ventilation and humidity/temperature control were delivered together.
From the Site 04
Select a photograph to explore the installation.
FOR YOUR PROJECT