SCA Mühendislik

SCA / MECHANICAL ENGINEERING

Mitsubishi Heavy Micro KXZ 6 HP VRF Outdoor Unit.

FDC155KXZEN1 / FDC155KXZES1 provides 15.5 kW nominal cooling and 15.5 kW nominal heating for homes, offices and compact commercial premises. We select the outdoor unit alongside room loads, operating hours and the indoor units that will run at the same time.

Istanbul based · Serving the Marmara region

FDC155KXZEN1 / FDC155KXZES1 VRF outdoor unit

FDC155KXZEN1 / FDC155KXZES1 provides 15.5 kW nominal cooling and 15.5 kW nominal heating for homes, offices and compact commercial premises. We select the outdoor unit alongside room loads, operating hours and the indoor units that will run at the same time.

Mitsubishi Heavy Industries FDC155KXZEN1 / FDC155KXZES1 VRF outdoor unit

Model specifications

  • Configuration: Front-discharge; single- or three-phase variants
  • Nominal cooling capacity: 15.5 kW
  • Nominal heating capacity: 15.5 kW
  • Nominal cooling input power: 5.2 kW
  • Nominal heating input power: 4.28 kW
  • Power supply: 1~/220–240 V • 3~/380–415 V
  • Maximum connected indoor units: 10 — Subject to the connection ratio and approved indoor-unit combination
  • Dimensions: 845 × 970 × 370 mm (H × W × D)
  • Net weight: 85 kg single phase / 87 kg three phase

Nominal capacity describes a stated test point, rather than guaranteed output at every outdoor temperature. We check design-temperature performance, piping corrections and the simultaneous demand of the connected rooms before confirming equipment selection.

Piping, height difference and operating limits

The catalogue reference is 100 m of total piping, with the longest route to an indoor unit limited to 70 m. The outdoor-to-indoor height limit is 30 m with the outdoor unit above the indoor units and 15 m with it below. The total length of 9.52 mm liquid line must not exceed 50 m. These limits must be satisfied together with pipe diameter, branch placement, equivalent length and additional refrigerant requirements.

  • Cooling range: -15 to 43°C — Outdoor dry-bulb reference
  • Heating range: -20 to 15.5°C — Outdoor wet-bulb reference

Front-discharge installation

The compact casing suits projects where outdoor equipment space is limited. We keep intake and discharge paths clear, assess hot-air recirculation and identify service access before agreeing the location. Wall screens, balcony enclosures and neighbouring windows are part of that decision.

Two-pipe operation and electrical variants

The Heat Pump circuit serves heating or cooling as a common operating mode, while rooms retain individual temperature control. For Micro KXZ, KXZEN1 and KXZES1 suffixes distinguish single- and three-phase variants. For FDC224KXZPE1 and FDC280KXZPE1, three-phase supply and their own connection limits apply.

What we check before selection

  • Room-by-room heat gains and winter heat losses
  • Simultaneous loads, connection ratio and indoor-unit compatibility
  • Outdoor airflow, structure, vibration and service access
  • Branch arrangement, piping corrections and refrigerant charge
  • Electrical supply, isolation, protection and control interfaces

Frequently asked questions

Does the maximum indoor-unit count guarantee full capacity in every room?

No. Connection count describes an allowed system arrangement. Available output depends on the outdoor unit, operating conditions and the combined demand of the rooms. We check both the count and capacity ratio before approving the combination.

Can I use these limits directly as an installation design?

The values support preliminary comparison. The final design also requires the exact model documentation, load calculation, branch and pipe selection, electrical coordination and commissioning procedure.

Explore the system

Read the Mitsubishi Heavy Micro KXZ engineering guide

Choose indoor units by airflow, available ceiling space and maintenance access, as well as nominal capacity.

Concealed ducted indoor units Cassette indoor units Read the SCA Mitsubishi Heavy catalogue

Plan your system with SCA

Share your floor plan, operating hours and preferred installation locations. Our Istanbul-based team supports projects across the Marmara region, from site survey and equipment selection to installation, testing and commissioning.

We coordinate the refrigerant circuit, electrical supply, drainage, ventilation and controls as one project. Your proposal identifies the selected models, accessories and installation scope.

Discuss your project Call SCA

FROM SURVEY TO INSTALLATION

Let’s put the right
system in place.

Share your plans, operating priorities and existing equipment.
We’ll define the scope together.

WhatsApp logo